Evaluation
Reducing experiment duration with predicted control variates
Our short summary of Etsy’s engineering write-up. The full story, with all the detail, is on their blog.
Read the full write-up on etsy.com (opens in a new tab)Problem
Experiments took too long, slowing product improvements.
Solution
They added predicted control variates to their A/B testing platform, cutting metric variance and shortening experiment time.
Average experiment duration reduced by 3 days
Want the architecture, code and numbers? They’re in the original post.
Read the full write-up on etsy.com (opens in a new tab)
PostHog